Main splint: 1 inner clip, 2 outer clips.
Accessories: high-strength bolts, filling boxes, fillers, marble glue, wire rope clips, gloves, belt hole saws
Product specifications: widths ranging from 150mm-2000mm.
Plywood installation method:
1. Use the main splint to tighten the two ends of the lifting belt with bolts.
2. After tightening, except that the two ends of the lifting belt are covered with glue, the wire rope core leaks out.
3. Fasten the wire rope cores at both ends of the belt in turn with wire rope buckles.
4. Fill the box cover with filler and marble glue, and wait for more than 40 minutes to solidify.
5. The mixing ratio of curing agent and marble glue is: 100 parts of marble glue and 5 parts of curing agent. Adjust the ratio appropriately according to the weather temperature.